Bewdley Flood Allevation Scheme 
Scheme details 
Client 
Jackson Civil Engineering 
 
JOS Value 
£425k  
 
Time 
2024 - 26 weeks  
 
Sectors 
Water - Envirnonment 
 
Purpose 
To create a flood defence for properties bordering the River Severn which are prone to flooding and improve the riverside experience for the general public.  
Key Data 
1303m2 of Formwork 
50t reinforcement fixed  
490m3 Concrete poured 
280m Hyrophyllic Strip Installed 
JOS Supply 
Labour 
Temporary materials 
Small plant 
 
 
 
 
Working in partnership with Jackson Civil Engineering, JOS delivered the FRC works to help to protect the Bewdley area from storm events which have previously inundated the area with flooding. This scheme will benefit 50 properties and maintain access to the businesses for decades to come. (Gov.uk, 2025) 
 
JOS completed the FRC works associated with the 300-metre flood defence alongside the River Severn, which included FRC walls and pile caps for temporary barriers to placed in flood events, reinforced concrete slabs and fixings for flood gates. 
 
The work was carried out in a sequential manner in small sections to assist Jackson in minimising disruption by maintaining highway and foot traffic through the area. 
 
 