Bewdley Flood Allevation Scheme
Scheme details
Client
Jackson Civil Engineering
JOS Value
£425k
Time
2024 - 26 weeks
Sectors
Water - Envirnonment
Purpose
To create a flood defence for properties bordering the River Severn which are prone to flooding and improve the riverside experience for the general public.
Key Data
1303m2 of Formwork
50t reinforcement fixed
490m3 Concrete poured
280m Hyrophyllic Strip Installed
JOS Supply
Labour
Temporary materials
Small plant
Working in partnership with Jackson Civil Engineering, JOS delivered the FRC works to help to protect the Bewdley area from storm events which have previously inundated the area with flooding. This scheme will benefit 50 properties and maintain access to the businesses for decades to come. (Gov.uk, 2025)
JOS completed the FRC works associated with the 300-metre flood defence alongside the River Severn, which included FRC walls and pile caps for temporary barriers to placed in flood events, reinforced concrete slabs and fixings for flood gates.
The work was carried out in a sequential manner in small sections to assist Jackson in minimising disruption by maintaining highway and foot traffic through the area.